Daimler Truck has the declared goal of developing sustainable and future-proof transport solutions for the movement of goods and passengers and putting them on the road.
In this context, the focus is also on the production of vehicles: By 2039, the company aims to achieve CO₂-neutral production in all plants and business units worldwide. The European sites will already be CO₂-neutral from this year onwards – partly by sourcing electricity from solar, wind and hydroelectric power.
Another important component of the “Green Production” initiative is the expansion of self-supply from renewable energies thanks to additional photovoltaic systems. At the German Mercedes-Benz plants in Woerth, Kassel, Gaggenau, and Mannheim, assembly of the new plants began in the fall and they are scheduled to be successively connected to the grid by May 2023.
Currently, 5,400 kWp of photovoltaic modules are installed at the German truck sites, so that – together with existing systems – up to 5,700 MWh of electricity can be generated per year. This is equivalent to the annual consumption of around 1,400 households with 4 people. The more than 13,000 modules, which are mainly installed on building roofs, have a surface area of around 39,000 m².
“Daimler Truck is clearly committed to the Paris Agreement on climate protection. We want to make sustainable transport a success and thus make an important contribution to combating global climate change,” says Sebastian Brendel, responsible for central energy and environmental management. “To drive the transformation of our industry forward quickly, we are active at all levels, including beyond the vehicle and accompanying services. We are working intensively to achieve CO₂-neutrality and decarbonization at our sites around the world and see great potential here in the future. The expansion of photovoltaics is an important contribution to Daimler Truck’s sustainable business strategy and a major step toward energy independence for the production sites.”
The initiative at the German truck locations kicked off in 2019 at the plant in Kassel: A 4,000 m² photovoltaic system has been installed on the roof of a new production hall and has been supplying the hall’s production with electricity since its commissioning.