Al Faris Group recently lifted the longest suspended bridge in the Northern Emirates that connects the two buildings of the new Mövenpick Resort at Al Marjan Island, Ras Al Khaimah.
The 36-m-long bridge was lifted in two sections using a Liebherr 600t crawler crane with SL2DB configuration and 96m main boom. The bridge was erected at a height of 50m from the ground level, and the maximum weight lifted with the crane was 165t including the hook block and lifting gears. The weight of the bridge section was 150t and that of the hook block and lifting gears was 15t.