Kanoo Cranes manages four tower cranes with the SMIE anti-collision system

Project: Lulu Hypermarket

Location: Sharjah

Contractor: Jazal Engineering & Contracting.

Scope: Crane erection, planning and safety.

Jobsite challenges: The construction project was in a congested area where the load of the tower cranes could not move over the roads around the site.

Solution: The SMIE anti-collision system was used to manage four Wolff 6531.12 tower cranes to ensure that the load was maintained within the red zone of the construction site.

Job duration: Over nine months