NEOM order comprises four each of EC600SJ telescopic boom lifts, X26JP spider lifts, ERT4069 compact Rough Terrain scissor lifts and E450AJ articulated boom lifts for locations in Sharma Village on the Red Sea and Bajdah Desert Studios in Tabuk province
NEOM
Helicopter-aided construction: ENOWA pioneers sustainable construction method in KSA to install transmission line towers
In a first for the Kingdom, heavy components airlifted to remote site by specialised helicopter, mitigating environmental impact in sustainable construction project
Saudi Arabia: On the road to economic transformation
As Saudi Arabia plans to invest more than $1 trillion over the next few years in some of the most ambitious projects in human history, the demand for heavy equipment and commercial vehicles is anticipated to increase dramatically
Petromin to operate state-of-the-art heavy machinery service center in Saudi Arabia’s NEOM
Petromin operates one of the world’s largest networks of vehicle maintenance facilities, with over 800 touch points in the MENA and select Asian regions
GE Grid Solutions secures major substation deal for NEOM’s green hydrogen project
GE’s GIS design and the 1.5 breaker configuration will help ensure uninterrupted operation at the hydrogen plant and the wind and photovoltaic plants
‘Port of NEOM’ is now open for business
The Port of NEOM is on the Red Sea, in Oxagon, set to serve all of NEOM, the Kingdom and beyond
Saudi Arabia’s PIF mulls launch of ‘heli-taxi’ company
Upon its launch, the air taxi operator would provide transport services within Saudi Arabia’s main cities, as well as tourist trips to key hotspots around the kingdom